Temporary Power Pole in Provo, UT

Provo Porta Pros supplies temporary power pole rental for construction sites, but electrical rough-in and permitting run through a licensed electrician and the city. A basic setup runs a meter socket, breaker panel and outlets on a treated pole rated to whatever amp service the job needs, most often 200 amp for a home build or midsize commercial site.

What Is a Temporary Power Pole?

A temporary power pole, sometimes called a construction temporary power pole or spec pole, is a freestanding post with a meter base, panel and weatherproof outlets that lets a crew pull power before permanent service exists. A basic temporary power pole diagram shows the meter socket up top, breaker panel below it, and outlets near ground level, all mounted on a treated post set a few feet into the ground. It sits near the property line where the utility can run a line to it, then feeds tools, lighting and trailers until the building has its own meter. Most sites pair it with other startup gear: a mobile office trailer, a light tower for early morning work, and a temporary fence to keep the pole and panel secured. If the project also needs washroom setup, that goes on a separate track entirely, covered under construction site services alongside portable toilet rental and handwashing station rental. In Provo, pole placement often has to clear sidewalks and drive lanes the same way a roll-off dumpster or storage container does, so give the delivery crew room to set it without blocking access.

What Are the Requirements for Installing a Temporary Power Pole?

Temporary power pole requirements come from the utility company and the city, not from us, and they cover pole height, grounding, meter base type and the amp service the panel is rated for. Installing a temporary power pole always starts with the electrician pulling a permit and coordinating a utility inspection before the line goes live, so budget time for that step before crews depend on it for tools and lighting.

Handwashing station rental

How Much Does Temporary Power Pole Installation Cost?

Installation cost depends on amp service, pole height, and how far the utility has to run a line to reach it. A 200 amp temporary power pole runs more than a 100 amp setup because the panel, meter base and wire gauge all scale up. Provo Porta Pros does not price electrical labor here, since that's licensed electrician and utility work, not equipment rental. What we can spec is the pole itself and coordinate delivery timing around your construction dumpster rental or temporary fence rental schedule so the site isn't juggling five trucks in one week. For comparison, here's what related site equipment runs on a similar job:

itemdayweekmonth
standard porta potty100-350130-500125-325
10-30 yard dumpstersee dumpster rental cost426-77891-500
storage container--100-250

Get exact electrical pricing from a licensed contractor; get equipment logistics squared away with request a quote.

Where Should a Temporary Power Pole Go on a Construction Site?

Placement matters as much as amp rating. The pole needs a clear path for the utility drop, solid ground for the base, and enough clearance that trucks delivering a 20 yard dumpster rental or a 40ft storage container don't clip it backing in. A roll-off delivery alone needs about 60 feet of straight clearance behind the truck, so pole and dumpster pads should never compete for the same approach. Keep it away from the temporary fence gate swing and clear of any restroom trailer hookup zone. If the site sits in Provo proper versus one of the outlying jobs Provo Porta Pros also covers, like a project 3.5 miles east in Orem or 9.4 miles southeast in Springville, the same clearance logic applies: give the pole its own footprint, separate from parking, sanitation, and material staging.

Do I need a permit for a temporary power pole in Provo?

Almost certainly, but permit rules and fees vary and need confirming directly with the city rather than guessed at. Talk to your electrician first since they typically pull the permit as part of the install. Provo Porta Pros can confirm placement logistics once permitting clears; see porta potty permit requirements for how we handle similar right-of-way questions on other equipment.

What amp service do most construction sites need?

Small residential remodels often run fine on 100 amp. Larger builds, or sites running multiple trailers and tools at once, usually spec 200 amp. Your electrician sizes it based on total load, not guesswork. This is separate from anything Provo Porta Pros rents directly.

Can I install the power pole myself?

No. Temporary power pole installation involves utility coordination and inspection, so it has to go through a licensed electrician. Provo Porta Pros handles the sanitation, fencing, and storage side of a site setup, not electrical work.

How long does a temporary power pole stay on site?

Typically for the full construction timeline, from early grading through final electrical inspection when permanent service takes over. That can run months on a larger Provo build, which is why coordinating it with monthly porta potty rental and storage timelines up front saves a second round of scheduling.

Does Provo Porta Pros install power poles?

No, we don't install electrical equipment. We supply the sanitation, fencing, dumpster, and storage side of a job site. For the pole itself, a licensed electrician handles design, installation and permitting; we're glad to coordinate delivery timing around that work on the same site.